Chat with us, powered by LiveChat

Field Change Order Confirmation (full size)

$25.00

Field Change Order Confirmation (full size)

$25.00

SKU: 0758112f5186 Category:

Description

This covers the same situation as in 2 above, except the construction change order language has been abbreviated. This is because it is used on the spot in the field (usually kept in the truck of the job superintendent or contractor) opposed to being prepared in the office. Comes with Legal Manual and Change Order Record Sheet and Log. View Sample PDF

Comments

comments

SKU: 0758112f5186. Category: .
0